Loch Raven Drive Closure Information
Scheduled to start June 16, 2025, Loch Raven drive will be closed between the bridge and Providence Rd (Area #1 on the picture). Once they're done there, they'll move to Area #2 (between Providence and the upper dam). Work on each area is scheduled for 90 days. During construction, the road will be blocked by heavy equipment with multiple holes being drilled in the roadway and shoulder, creating a safety hazard for pedestrians.